Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the gd-system-plugin domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114

Notice: Constant LLA_PLUGIN_URL already defined in /var/www/wp-content/plugins/limit-login-attempts-reloaded/limit-login-attempts-reloaded.php on line 18

Notice: Constant LLA_PLUGIN_DIR already defined in /var/www/wp-content/plugins/limit-login-attempts-reloaded/limit-login-attempts-reloaded.php on line 19

Notice: Constant LLA_PLUGIN_FILE already defined in /var/www/wp-content/plugins/limit-login-attempts-reloaded/limit-login-attempts-reloaded.php on line 20

Notice: Constant LLA_PLUGIN_BASENAME already defined in /var/www/wp-content/plugins/limit-login-attempts-reloaded/limit-login-attempts-reloaded.php on line 21

Notice: Constant LLA_DIRECT_ADDR already defined in /var/www/wp-content/plugins/limit-login-attempts-reloaded/limit-login-attempts-reloaded.php on line 26

Notice: Constant LLA_PROXY_ADDR already defined in /var/www/wp-content/plugins/limit-login-attempts-reloaded/limit-login-attempts-reloaded.php on line 27

Notice: Constant LLA_LOCKOUT_NOTIFY_ALLOWED already defined in /var/www/wp-content/plugins/limit-login-attempts-reloaded/limit-login-attempts-reloaded.php on line 30

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the limit-login-attempts-reloaded domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Finishing The Guest House – The Paulk Pack

Finishing The Guest House


It was down to crunch time. Kristin and Rob had a move in date of July 29th, so we spent almost 3 days straight finishing all the last touched on the guest house. Charles and I worked well into the night for several nights straight just to finish everything from the new light fixtures, appliances, cabinet hardware, plumbing, doors, trim and paint.

These pictures were taken the night of my birthday at about midnight.
We were exhausted but everything got installed that night before sunrise…
Before
Before
This are the after pictures once the upper cabinets
had been installed and Kristin and Rob had settled in.
After
After